Integrated intelligent unitized operation electrical lifting scaffold/platform

  • Minimum order:1
  • Place of Origin:China
Working inside of the formwork keeps the workers safe. With integrated all-steel and fully enclosed structure and the galvanized hole punched mesh, the formwork looks tidy and fireproofing. Installation and adjust floor by floor, the deviation will be absorbed in next floor, so that the deviation will not accumulate with the increasing storey. All the integrated formwork climbs together and does stop until reaches the top. Except the first installation, the crane will not be used during the construction.

Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd

Tel: 86-514-86468284 Country: China (Mainland)