Artificial turf how to renovate

  • Place of Origin:China (Mainland)
  • Minimum order:10
  • FOB Price : USD $59.00 / Piece
What problems and precautions will be encountered in the process of renovation of an old man-made lawn venue?

1.the renovation of artificial turf sites need to remove the old artificial turf, replace the new artificial turf. The first step is to remove artificial turf, which is the key link. The first thing to note when removing artificial turf is not to spoil (eradicate) the original artificial turf foundation. The artificial turf foundation is usually made of cement, asphalt, or other lime-soil cushion. The artificial turf is adhered to Ground or seams and non-woven fabric above, the removal of artificial turf, the use of tools to remove the artificial lawn and bonding layer, do not damage the foundation of artificial turf pit bumpy.

2. In addition to the removal of these waste materials are tonnage as a unit, so in the quotation process to give full consideration to a lot of novices to see the venue when the venue to see artificial turf lawn bald approaching bald, that need to carry garbage disposal will be Less, actually not true. Because of the amount of quartz sand that is filled at the time of the construction of the new artificial turf field, the amount of quartz sand is unchanged. Taking a standard soccer field as an example, the filled quartz sand is about 200 tons, so this is a very Large waste removal work must therefore be fully considered when making the budget.http://www.gmartificialgrass.com/

Changzhou Golden Moon Fabric Factory Co., LTD

NO.11 Chuangye East Road, Baizhang Industrial Park, Xinbei District, Changzhou, Jiangsu Province, China. Tel: 86-519-68000720 Fax: 86-519-68856880 Mobile: 8615061960650 Country: China (Mainland)