GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
INTRODUCTION:
It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.
PAMAMETERS:
GDKC-2000 Transformer Load Voltage Adjustment Switch TesterPARAMETER | GDKC-2000 |
---|---|
Auto./manual | Fully-automatic |
Fuction | Test transformer load voltage adjustment switch |
Test power | Three ways independent power |
Max. output current | 0.5A |
Processing part | 8 digit microprocessor high speed A/D onverter, the maximum sampling rate can reach 400KHz |
Test set sampling rate | 10~20KHz |
Maxmum save time of single waveform | 6.4s |
Transition resistance measuring scope | 0~40Ω |
Measuring precision | 1-5W Δ≤±10%, 5~40W Δ≤±5% |
Protection | Power off-off protection, over-voltage protection |
Tim display | Perpetual clock |
Date print | Yes |
Power supply | 220V±10% power: 200W |
Dimension | 410*320*260 mm |