Double cage 2 tons Building Construction Crane Hoist

  • Minimum order:1
  • Place of Origin:China
Building Construction Passenger Lifting Hoist SC200/200BD
1.Compacted structure;smaller cubic meter;excellent characteristic;convenient maintenance
2. Main electric stuffs are imported form foreign for e-control system
3. Cable Trolley are adapted to different height under the stipulated circumstance.
4.Power saving running smoothly at starting and braking.
5.With fault detection system.
6.Rated loading capacit: 2×2000kg.
7.Speed:0-40m/min (or 0-46m/min)
8. Rated lifting capacity of suspension rod:200kg.
9. Maximum lifting height:550m.
10.Internal net dimensions (L*W*H) of suspension cage: 3.2×1.5×2.35m(The dimensions of the cage can be designed according to the customer\'s requirements).
11. Power voltage:380±5% /50Hz.
12. Motor power:Chinese or NORD
13.Mast section dimensions (L*W*H): 0.65×0.65×1.508m.
14. Frequency convertible control system.
15. With large skylight, available for mast section through.
16. The device with PLC automatic landing can be selected.

Dongguan Yixin Qingjiang Machinery Manufacturing Co.,Ltd

Tel: 86-0769-88129116 Country: China (Mainland)