GTES can be used as the main or stand-by power supply |
DescriptionThe genset has a simple and convenient in maintenance design, which consists of modules. The main component of the electric power station is GTU-12PER gas turbine. The power station is completed with necessary maintenance systems and auxiliary accessories.In GTES-12P design advanced technologies were used as well as rich experience of Aviadvigatel gained from development and operation of gas turbine engines and power stations.GTES-12P genset can be operated at simple, cogeneration and steam-gas cycles, at base, semi-peak or peak loads.
They are applied in building new facilities and reconstruction of existing municipal boiler and heating plant s, Sate District Power Plants, CHP plants, housing maintenance and utilities infrastructure.They can be used:as the main or stand-by power supply;independent or ...
The main distinguishing feature is a new power turbine with rotation speed rated at 3 000 rpm. The reduced turbine rotation speed allows to drive a generator without matching reduction gearbox and therefore to enhance reliability of gas turbine and to reduce total operational ...
They are applied in building new facilities and reconstruction of existing municipal boiler and heating plants, Sate District Power Plants, CHP plants, housing maintenance and utilities infrastructure.They can be used:as the main or stand-by power supply;independent or together ...
They are applied in building new facilities and reconstruction of existing municipal boiler and heating plant s, Sate District Power Plants, cogeneration heat and power (CHP) plants, housing maintenance and utilities infrastructure. They can be used:as the main or stand-by ...
DescriptionGTES-25P gas turbine electric power station is developed by OJSC ?Aviadvigatel? on the basis of GTU-25PER gas turbine with the PS-90EU-25 engine. This engine is a modification of the high-performance PS-90A aircraft engine, which was the first Russian engine to get ...