SCRAP METAL

Delivery Time: ASAP
Package: TO BE ANNOUNCE
Supply Ability: 30,000 Metric Ton per Month
Payment Terms: L/C,T/T
Place of Origin: Ohio United States

We will proceed, after purchase of the factory, to demolish and ship the material to you at the cost of One Hundred and Ten U.S. Dollars (U.S.$110.00) per metric ton.  This cost will apply to all the material on site to the last metric ton shipped and will be charged via the B.O.L. and paid accordingly. The other option is to handle all of the demolition on your end. CONTACT US.

Upon this payment of Twelve Million Six Hundred Thousand U.S. Dollars (U.S.$12,600,000.00) the ownership of the factory would be transferred to you.  Payment is to be distributed as follows:
Three Million U.S. Dollars ($3,000,000.00 U.S.) deposited upon verification of material by yard visit
The balance of Nine Million Six Hundred Thousand U.S. Dollars (U.S.$9,600,000.00) to be paid by opening an Irrevocable Letter of Credit within three (3) working days of the initial deposit.
The transfer documents would be submitted to you within seven (7) working days of the initial deposit, upon which the final payment is to be made.

This Factory is to be sold at One Hundred and Forty U.S. Dollars (U.S. 140.00) per metric ton totaling Twelve Million Six Hundred Thousand U.S. Dollars (U.S.$12,600,000.00).

The materials on hand as per the SGS Inspection Report weighs approximately 90,000 metric tons.  A B.L.C. from your representative financial institution is required.

Draft Transaction Details

The ports being considered for usage are the La Brea Port or Point Lisas Shipping Port for departure from Trinidad.  All shipment will be bulk shipped.  It is the buyers responsibility to provide necessary shipping destination details to effectively manage this process.  The bulk shipping capacity is measured at Thirty Thousand (30,000) Metric Tons.

Shipping Considerations

The process will be photographed, with pictures of every floor and interest areas of the factory, to catalog the asset.  A schedule of demolition will be provided so that shipments could be easily verified on the receivers end.  Each trailer will be weighed, photographed and signed off or approved for leaving the compound and checked off on a master sheet of assets.  It will be moved to the storage area on the docks to achieve the necessary tonnage requirement for shipping.  When this weight is achieved, it will then be moved dock side and stockpiled in a manner that it could be reached by the ship cranes.  The equipment to achieve this will be provided by the demolition contractor whose contractual responsibility of the assets will be from demolition to delivery at port as per F.O.B. arrangement. 

The material on being removed from the main structure, will be cut to manageable sizes and placed in lots, photographed and cataloged for its content, packed onto trailers and weighed using a portable truck scale, then transported to the port for storage in a laydown yard.  Material required to meet the ships capacity will be at dock side twice per month.  A forecasted schedule will be forwarded to you before the start of the demolition process. 


Process

All the necessary clearances for demolishing and removal of materials are in our possession.  We will be monitored by the factory Inspectors according the OSHA standards, with special emphasis to safety procedures, the use of properly certified scaffolding and demolishing processes etc.

We have contracted out the demolition of the factory to a company that has all the licenses for demolition and the necessary equipment needed to effectively carry out the task.  They will also be responsible for the transporting of material to the dock and the moving of the material on the docks. We have a secure laydown site on the docks where we will stockpile the materials.  When the ship is due for loading, the material will then be moved to dock side for uploading.  SGS Inspection Services will be provided to assure what is taken off the site at the factory is delivered to you.

Licenses and Equipment

The present on hand stock consists of the following materials, HMS 1, HMS 2, Stainless Steel, Cast Steel, Cast Iron, Copper and Aluminum.

Stock

They are as follows:


This is our revised offer of sale, including all the required and necessary processes to effect a smooth transition of the materials from Trinidad to you.  All necessary details regarding down-payment, money transfers and other necessities will be addressed as needed, but these basic details are given to invite your tender or bid.

Sugar Mill Steel Details

MAKE $6,000,000.00 USD ON A $3,000,000 USD IN TWO MONTH. OR (OPTIONAL PLAN AS FOLLOWS:

SCRAP METAL

  • Place of Origin:Ohio United States
Wall Art Decor Flowers | Modern Elements Metal Art
Wall Art Decor Flowers | Modern Elements Metal Art

• Title: Wild Flowers • Size: 40” W x 16” H (1000 x 400mm) • Material: Aluminium Sheet Metal • Technique: Hand-painted & Sculpted • Easy to display and comes with hangers & foam spacers on the back. • Mounted: Art is hung on the wall with two screws or nails. ...

Modern Elements Metal Art

Blue Metal Wall Art | Modern Elements Metal Art
Blue Metal Wall Art | Modern Elements Metal Art

Artist - Christopher Henderson Titled - InBloom (Blue Art Edition) Dimensions - See Options This modern art piece floats off the wall Colour is Blue and Silver Tones ( Any other colour seen in these pictures are only reflections and shadowing) Handcrafted with marine grade ...

Modern Elements Metal Art

Modern Wall Decor | Modern Elements Metal Art
Modern Wall Decor | Modern Elements Metal Art

• Title: Xplosion (4 Piece Artwork) • Style: Modern | Contemporary | Abstract • Highly Detailed & holographic patterns • Unique style - Natural Silver or Highly Saturated Colours • Lightweight and sturdy • Eco-friendly, 100% post-consumer recycled • Made from ...

Modern Elements Metal Art

Teal Metal Wall Art  | Modern Elements Metal Art
Teal Metal Wall Art | Modern Elements Metal Art

Titled - Radiation - Teal Edition Metal Artist - Christopher Henderson Style - Metal Art | Modern Art | Contemporary Art Dimensions - See options above Materials - Aircraft Quality Alloy Color - Teal & Silver Tones (Any other colos seen are reflections or shadows) Mounting - ...

Modern Elements Metal Art

Heavy Duty Standard Metal Chrome Wire Shelving
Heavy Duty Standard Metal Chrome Wire Shelving

This easy-to-assemble 4/6-Shelf Decorative Wire Chrome Finish Commercial Shelving Unit from ACEALLY provides storage space for any room and purpose including commercial, industrial and residential use. The 4/6-tier shelving unit is made of tubular steel and wires coated with a ...

Sinoracking

Cobalt Metal
Cobalt Metal

Cobalt is a shiny steel-gray metal, relatively hard and brittle, ferromagnetic, heated to 1150℃ magnetic disappear. The combined valence of cobalt is 2 and 3. It does not interact with water at room temperature and is stable in humid air. It is oxidized to CoO when heated to ...

Beijing Huasheng Metal Materials Co., Ltd

Chromium Metal
Chromium Metal

Chrome, white, generally exists in the form of chromium iron compounds in the nature, the iron black or dark brown, block shape, dot, lenticular, ribbon, etc. Chromium is a very versatile metal. Chromium is a pure chromium metal that is refractory (melting point 1800℃) and ...

Beijing Huasheng Metal Materials Co., Ltd

Refractory Metals
Refractory Metals

As one of the reliable refractory metal suppliers, Huasheng Metal are keeping a large and comprehensive inventory of the highest quality in form of types of refractory metals such as Powder, Bar, Rod, Sheet, Ingot, Wire and Block, etc., to ensure our customers with fast ...

Beijing Huasheng Metal Materials Co., Ltd

Metal-framed Tube Temporary Fencing
Metal-framed Tube Temporary Fencing

Fully metal-framed fence panels are designed for temporary security applications, offering a secure and sturdy barrier suitable for construction sites, events, crowd control, and public safety measures. These panels are durable, stable, and resistant to wear and environmental ...

Frishine Temp Fence

CV Joint Bearing For Steel and Non-ferrous Metal Industries
CV Joint Bearing For Steel and Non-ferrous Metal Industries

The main CV joint bearing is ball cage type, designed and developed BJ, BHJ, BJS, BC, DOJ five categories, compared to NTN, the model specification is more complete, for different fields, use conditions, almost all can choose the appropriate coupling. In the field of vehicles, ...

BOYA Precision Industrial Equipments Co.,Ltd